When the County of Bexar, TX, Public Works Department needed to replace the deteriorated Ira Lee Road box culverts over Salado Creek, they chose an alternative superstructure that would increase capacity on the necessary waterway area beneath the bridge and also reduce the construction schedule by up to 45 days. Download